Most plan sets get kicked back for fixable issues. We catch them before the city does.
PDF upload · Results in ~10 minutes · Free
Site plan gaps. Missing setback dimensions, property lines, or existing structures slow intake immediately.
Scope mismatch. The application, valuation, and drawing set describe different work.
Energy and calcs. Title 24 documents and structural backup are missing from the packet.
Project-specific reports. Grading, soils, or special inspection documents were needed but not included.
Sheet coordination. Architectural, structural, and MEP notes do not agree across the set.
Upload your permit drawings and we’ll scan them against City of Bakersfield requirements — permit type, required sheets, code references, setbacks, and the common issues that trigger corrections.
Bakersfield’s Building Division handles a wide range of residential and commercial permit work. Whether you’re planning a new home, an ADU, an addition, reroof, solar project, or tenant improvement, our pre-check helps you catch missing documents, Title 24 gaps, and plan-set inconsistencies before first submittal.