PERMIT PRECHECK | CITY OF GILROY

Ready to
permit?

Most plan sets get kicked back for fixable issues. We catch them before the city does.

PDF upload · Results in ~10 minutes · Free

Top reasons plans get sent back

1

Site plan gaps. Missing setback dimensions, property lines, fire access paths, or hydrant distances.

2

Cover sheet incomplete. Missing occupancy class, construction type, applicable codes, or scope of work.

3

Energy and calcs. Title 24 CF1R form or CALGreen checklist missing from the plan set.

4

Structural details. Shear wall plans, holdown schedules, or truss calculations not included.

5

Fire and safety. Smoke alarm locations, CO detectors, or fire separation ratings not shown.

We check your plans so
the city doesn’t send them back.

Upload your permit drawings and we’ll scan them against City of Gilroy requirements — permit type, required sheets, code references, setbacks, and the common issues that trigger corrections.

Gilroy’s Development Service Center reviews ADU and commercial building permits against the California Building Standards Codes. Our pre-check helps you catch missing documents, site plan gaps, Title 24 issues, and plan-set inconsistencies before first submittal.

  • 1
    Upload your PDF plan set. Pick the Gilroy permit type that matches the actual project.
  • 2
    AI reviews every page against Gilroy-specific requirements and California code expectations.
  • 3
    Get your report in ~10 minutes with the missing items and mismatches to fix before you submit.