As heard on the AI for CRE Collective with Jake Heller

Stop losing months to correction letters.

Check your plans against the city's exact codes before you submit.

Exclusive for CRE Collective members — get 500 pages for $1000 free when you meet with us.

Meet With Us
set4.io/code-comments
Code Comments4 found
Door Width Below Minimum
IBC 1010.1.1p. 12
violation
Grab Bar Missing
IBC 1109.2.2p. 12
warning
Egress Window Undersized
IBC 1030.2p. 14
violation
Hallway Width Below 36"
IBC 1020.2p. 12
warning
Page 12 of 47
100%+
BEDROOMLIVING ROOMKITCHENHALLBATHBEDROOM 214'-6"20'-0"
1
Door Width
2
Grab Bar
3
Egress Window
4
Hallway Width

Why owners and developers use Set4

Catch errors before the city does

Every code error in your plans means a correction letter, a resubmittal, and weeks added to your timeline. Set4 catches those errors before you file.

Jurisdiction-specific reviews

We're the only tool built to review against each city's specific local amendments — not just base ICC codes. The same codes your plan reviewer checks against.

Any jurisdiction, nationwide

Don't see your jurisdiction? We'll add it. Tell us where you're submitting anywhere in the country and we'll have it ready for you.

Ed Maclean

Meet with Ed

Founder & CEO, Set4

Meet With Us →

About the episode

Episode: AI for CRE Collective

Ed joins Jake Heller on the AI for CRE Collective podcast to talk about the permitting delays that kill deal timelines — and what owners and developers can do about it. They cover how AI plan review works, why most code errors are completely avoidable, and how checking your plans before submission can take months off your permitting timeline.

If you've ever watched a project stall because of a preventable correction letter, this episode is for you.